RESEARCHER PROFILE
Jörg Benndorf
← Back to TU Bergakademie Freiberg
J
TU Bergakademie Freiberg
Jörg Benndorf works in Mining Techniques and Economics, Geological Modeling and Analysis, Mineral Processing and Grinding, Geomechanics and Mining Engineering, Soil Geostatistics and Mapping. Recorded institutional associations include TU Bergakademie Freiberg.
127Publications
795Citations
16H-index
Inclusion identifies researchers whose recorded research contributions may inform their university’s understanding of its research community. It does not rank individual research quality or establish current employment.
Selected research works
Up to 100 highly cited works; DOI links open the original research. Counts reflect the collected record, not real-time citation totals.
Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty
2013 · 92 citationsA Simulation-Based Geostatistical Approach to Real-Time Reconciliation of the Grade Control Model
2016 · 46 citationsApplication of efficient methods of conditional simulation for optimising coal blending strategies in large continuous open pit mining operations
2012 · 43 citationsMaking Use of Online Production Data: Sequential Updating of Mineral Resource Models
2014 · 35 citationsSimulation-based optimization approach for material dispatching in continuous mining systems
2018 · 29 citationsReal-time reconciliation of a geometallurgical model based on ball mill performance measurements – a pilot study at the Tropicana gold mine
2018 · 26 citationsRecent Developments in Closed-Loop Approaches for Real-Time Mining and Petroleum Extraction
2017 · 25 citationsSensor-based real-time resource model reconciliation for improved mine production control – a conceptual framework
2016 · 25 citationsA review of positioning technologies for personnel and equipment in underground mines
2025 · 20 citationsNew Efficient Methods for Conditional Simulations of Large Orebodies
2018 · 18 citationsRTRO–Coal: Real-Time Resource-Reconciliation and Optimization for Exploitation of Coal Deposits
2015 · 18 citationsReal-time resource model updating for improved coal quality control using online data
2016 · 18 citationsThe effect of geological uncertainty on achieving short-term targets: A quantitative approach using stochastic process simulation
2016 · 18 citationsClosed Loop Management in Mineral Resource Extraction
2020 · 18 citationsUpdating the coal quality parameters in multiple production benches based on combined material measurement: a full case study
2017 · 17 citationsReal Time Mining—A Review of Developments Within the Last Decade
2025 · 17 citationsResource and Grade Control Model Updating for Underground Mining Production Settings
2020 · 16 citationsTRIM4Post-Mining: Transition Information Modelling for Attractive Post-Mining Landscapes—A Conceptual Framework
2022 · 16 citationsSensor Based Real-Time Resource Model Reconciliation for Improved Mine Production Control—A Conceptual Framework
2018 · 14 citationsPerformance optimization of complex continuous mining system using stochastic simulation
2014 · 13 citationsResource Model Updating For Compositional Geometallurgical Variables
2020 · 13 citationsInvestigatingin situvariability and homogenisation of key quality parameters in continuous mining operations
2013 · 12 citationsOperational Decision Support for Material Management in Continuous Mining Systems: From Simulation Concept to Practical Full-Scale Implementations
2017 · 12 citationsRemote monitoring of land degradation in the mining context: an updated review focusing on potentials and challenges
2024 · 12 citationsHybrid geostatistical and deep learning framework for geochemical characterization in historical mine tailings
2025 · 11 citations
